Projects / Biologic Building Heat Pump Project (Alexion Athlone)

Removal of natural gas usage. Reducing carbon footprint.

Heat Pump install in Biologic Building

In 2022, Alexion sought to develop their existing manufacturing facility. A project that involved unique design and install of a heat pump to reduce the facility’s dependency on natural gas and lower their carbon footprint. The 4-pipe heat pump electrified low pressure hot water for space heating, replacing the existing conventional gas boiler. Rockwell carried out PSCS responsibilities for the duration of the project, as well as installing the corresponding pipework systems in order to connect the heat pump to the existing facility.

Contracted directly to EM3, the project was completed on schedule this year.

Connect with
our team

Talk with our team and see how Rockwell can best support your project.

Damien Robinson
BENG(HONS), MENG
Project Manager
Paddy Ryan
Construction Manager
Kateryna Khomenko
Meng, Beng
Senior HVAC Design Engineer
Careers

Great projects
need great people.

We’re now embarking on a phase of significant growth and development in Ireland and beyond. We have opportunities from senior management to trainee operatives, but are particularly focused on developing our directly employed workforce – our greatest proven resource in delivering success.

 

Billy Walsh, Construction Manager,
With Rockwell 40 years

Let’s Talk

See our contact page for further details, or fill out this form, and we’ll get back to you promptly.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.
*Required Field.