• Heat pump delivering decarbonisation of site thermal utilities through integration of a 445 kW multi-pipe system into the LPHW network
• System recovers waste heat from the Cooling Tower Water (CTW) circuit to meet the site’s diversified heating demand
• Installation includes dedicated CTW and LPHW pumping sets
• Full scope covers all associated pipework, valving, and ancillaries
• Delivered as a complete turnkey solution, from installation through to commissioning.